When instant restore VM to Hyper-V, what are the steps required during Disk Finalization?

When a VM is recovered in instant restore, it will read directly from Backup Data, and at the same time write any new changes to a delta disk. In order to make the instant restored VM a permanent production VM, customer would need to schedule a time (less intensive IOPs period), to finalize the disk and merge 2 into 1.

http://www.acronis.com/en-us/support/documentation/Acronis_Backup_Cloud/index.html#35687.html


Currently Finalization can be easily done when restored to ESXi Platform, and VM will be running while Finalization occur. However, when restored to Hyper-V, customer will need to perform manual steps and shut down VM during Finalization step.

The steps required are described here https://forum.acronis.com/forum/125402#comment-388735

       

Based on latest update from Acronis Product Team, automated Hyper-V Finalization will only be available towards end of 2017.